Did some assembly of the input paths. The CLF (orange) and front seed (red) paths use the standard mode matching solution for the VIP CLF paths at the sites. Attached is a picture of what has been completed so far. Components are as follows:
- L1, L2: E1700261-v1–04 - lens ROC +150 mm, f=334 mm at 1064.
- DC1, DC2, DC3: E0900491-v4 Dichroic Beamsplitter, HR1064/HT532 -- I moved 2x over from the VOPO suspension and replaced with LaserOptik dichroics.
- M1: E1600126 - HR 1064 @45
- M2: E1000068 - HR 532 @45 -- I moved this over from the VOPO suspension and replaced with E1600244
- RHWP: Precision Photonics WPZ10H-FY
- GHWP: Lambda Research optics WPO-1.0CQ-0-2-532
- FCG: C1700080 Lightpath 355230-FCAPCV-532
- FCR1 FCR2: C1700080 Lightpath 355230-FCAPCV-1064
- RPol1, RPol2: E1700253 TFPI-1064-PW-1025-UV
- GPol1: E1700253 TFPI-532-PW-1025-UV
Notes/thoughts:
- I took 8x Siskiyou 1" mirror mounts from the stash we removed from HAM-X in May to complete the rest of the breadboard.
- Our plan is to have the squeezing path leave the chamber through a 4.5" flange with a superpolished viewport and all other beams leave through the 6" flange with the old HAM-X viewport (Dual AR, but not superpolished).
- We need to make/find some clean black glass beam dumps. I didn't prepare any; an oversight in my planning.
- We need to purchase and clean 2x additional thorlabs size 11 collimator holders for 1" mirror mounts.
- Counting holes, I suspect that I made the seed path an inch too long. I think that both L2 and FCR2 need to slide an inch closer to the chamber.