Eric, Wen
Now that the SHG is working with good efficiency, we aligned the green path on the SQZ table to deliver the pump light to the VOPO. The power budget of the path is shown in the attachment. We got about 78% coupling to the fiber using the old set-up. The pump out of the fiber is around 30 mW, and can potentially be increased to 87 mW for the VOPO NLG sweep in the future. We'll clean up some hardwares before the vacuum prep lab shutdown and continue aligning the seed path tomorrow.