[Wen, Eric]
Today we started constructing a pair of setups in the VOPO assembly cleanroom:
- The first setup will become our testbed for characterizing the two VOPO spare cavities that we are preparing for the O5 comissioning break. We've decided to repurpose the old HAM-X VOPO injection platform as a clean build station. We removed the existing VOPO along with a fair number of the optics and left just enough to inject light into the cavity from both sides and steer the reflected beams onto photodiodes. We set position references for the old cavity so that we can simply place a newly assembled VOPO at the same location to quickly couple light into the cavity for convenience. The attached photo shows the new setup. We may end up removing one of the blade spring towers to make it a bit easier to reach in and make adjustments to the cavity.
- The second setup will become the new LASTI in-vacuum squeezing prototype that will be used to develop a source that can produce 10 dB of measured squeezing 24/7 and to investigate new non-linear crystals with (hopefully) improved longevity. Today we moved the LASTI VOPO onto a circular breadboard that will eventually be installed inside the VOPO test chamber and began gathering the optics and optomechanics required for the injection and readout paths.
The next steps are:
- Procure any additional optics or cabling required for the squeezing prototype. It looks like all we need are in-vacuum fiber collimators that are compatible with Wen's mode-matching solution. We may need to build and/or clean some in vacuum dsub cabling to wire up both squeezers. We will dig through our cables tomorrow to determine what we already have on hand.
- Populate the circular breadboard and install in the VOPO chamber. We're waiting for some new optical table legs to arrive before we move the chamber to its final location.
- Unpack the site VOPO components in the cleanroom once the circular breadboard has been moved and then begin constructing our VOPO spares.