jacques - posted 16:02, Sunday 08 September 2024 (11753)
AM modulator installed and intensity stabilization loop implemented

(Saturday)

Following the previous logbook entry, I installed a New Focus 4104 amplitude modulator between a half-wave plate and a PBS on the laser path, before it being coupled to the fiber.

The AM's manual is here. Without any other optics, the AM is actually a voltage-dependent waveplate. It is converted to an intensity modulator by placing it between two polarizers (the first one to align the polarization on the AM's prefered axis, the second one to do the intensity filtering). I use a half-wave plate as the first polarizer and a PBS as the second polarizer, which amounts to the same. 

I then realigned the path to the fiber coupler and obtained the same coupling ratio as before (between 170mW and 200mW arriving on the Ubench). 

I then tested that the setup worked properly to control the laser power, by plugging REDPITAYA27.MIT.EDU's "out1" port to a Thorlabs PZT driver (the +-1V range of out1 gets converted to +-15V, which is enough for our stabilization range) then to the AM, then I took the PD on the cSQZ board after the first PBS to monitor the power and plugged it to the RP's "in1". I plot the normalized power vs RP's output voltage here. I see that the AM's response (W/V) is actually linear in the range of the RP, and that it has enough range (6% of the total power) to actuate the expected power fluctuations.

The control loop is then closed on the fluctuations of the PD after the PBS, and the results are plotted and compared using a scope acquisition over several minutes, as shown here. After computation of the normalized (unitless) standard deviations when the loop is open vs when it is closed, I obtain 5.2e-3 when the loop is open vs 1.65e-3 when the loop is closed, thus showing that the AM loop indeed manages to reduce the power drifts.

The PID parameters for this PD are P = 20 and I = 100. The RP did not saturate over the ~10 minutes this loop was closed.

After these tests, I unfortunately realized that the PD after the PBS was not well positionned in the path of the IR beam and thus most likely received a stray beam. Subsequent tests can be directly done by choosing another PD to close the loop on such as the trans GR after the OPO, in order to directly actuate on the power that matters for squeezing production.

This scheme can also be implemented on the polarization controller instead of the AM, if we observe that the SQZ generation drifts are coming from the cSQZ setup itself and not the main laser, thus not disturbing the power of the LO fields.