Displaying report 1-1 of 1.
Reports until 01:45, Sunday 08 September 2024
cSQZ General
jacques - posted 01:45, Sunday 08 September 2024 (11752)
Investigating SQZ drifts

(Friday)

It is currently impossible to acquire quality data on the compact squeezer because all the monitor PDs show that the powers (incident IR, GR, CLF) are drifting too much and too quickly (timescale 1 to 10s). This means that we cannot have a squeezing measurement which is stable for more than a few minutes. We have to constantly readjust the OPO temperature and recalibrate the CLF's resonance.

To quantify this I took scope traces of different monitor PDs along the path of the cSQZ.

- Ch 1: I plugged a PD on the fiber which is going to the VOA for the MZI LO and monitored the power. This should be an indication of the power at the level of the lightwave's fiber coupler, as well as the power that is arriving on the cSQZ before the PBS. 

- Ch 2: I plugged a PD on the fiber which is going to the PD on the cSQZ board after the first PBS. This is an indication of the power going into the SHG.

- Ch 3: PD of the GR in transmission of the OPO

- Ch 4: PD on the SQZ path after the OPO (monitors CLF amplification).

I took two batches of data over >400s each time, montioring either all four channels, or the first two channels (with a higher internal gain on Ch 2 to increase the SNR on the scope). I subtracted the DC biases of all photodiodes. I then apply a lowpass (butterworth) of cutoff frequency 0.5Hz to further filter the noise.

I obtain the following curves. I see (and I can compute) that all these channels are correlated, which leads me to believe that there are effective power drifts of the NPRO of the order of several percents over minutes. This in turn changes the power of produced GR, which changes the OPO's temperature control setpoint (recall that this needs to be controlled down to 0.02°C), and thus leads to CLF amplification fluctuations and SQZ drifts.

Another cause of SQZ drift could be the ambiant temperature which has increased by 2°C over two days, going from 21 to 23°C on the optical table. This has plagued us since May and still hasn't been reliably fixed, which is unacceptable.

Non-image files attached to this report
Displaying report 1-1 of 1.