eoelker - posted 17:08, Saturday 10 August 2024 (11721)
SHG Installed and aligned

[Vicky, Eric, Naoki]

We unpacked and installe SHG 2 from LHO (ics 13429) on the LASTI squeezing table yesterday.

A bit more info about the current status of this SHG can be found here:  78556 and 78686

This afternoon, I aligned the SHG and was able to see flashes almost immediately.  Currently, we're seeing about 8% of our power in a 2nd order mode, suggesting some mode mismatch between the SHG and the pump beam.  I think this is sufficient for now.  Vicky is going to help me with getting the controls and automation back online on Monday so we can lock the SHG.  

Images attached to this report