[Vicky, Eric, Naoki]
We unpacked and installe SHG 2 from LHO (ics 13429) on the LASTI squeezing table yesterday.
A bit more info about the current status of this SHG can be found here: 78556 and 78686
This afternoon, I aligned the SHG and was able to see flashes almost immediately. Currently, we're seeing about 8% of our power in a 2nd order mode, suggesting some mode mismatch between the SHG and the pump beam. I think this is sufficient for now. Vicky is going to help me with getting the controls and automation back online on Monday so we can lock the SHG.