The old VOPO/PSAMs tank that used to live in the green lab sustained some mild water damage along the top sealing surface during last year's flood. A few months ago, I removed the corrosion with citranox and cleaned the oring while we were removing the PSAM components from the chamber. This morning, I removed the remaining PSAM cabling, wiped down the inside of the chamber, and resealed the lid.
I hooked up the micromirror pumping station to the chamber and am now pumping down to see if the lid is still able to hold a decent vacuum. Right now we're at 9e-4 and dropping. Its been a long time since I've used this chamber, so I don't recall what base pressure I was able to reach in the past, but if we get into the 10^-5's it is still servicible.
The actual turbo for the chamber should have a higher pumping speed than this pump station given its long narrow bellows connection. We need a computer connection to run that turbo again as well as a roughing pump. Looks like someone walked off with the old scroll pump for that chamber.
If I had a computer set up in our cleanroom, I'd make a pumpdown curve, but alas...
This is now at 9e-6. Given the modest pumping speed with the current setup, I think that this pressure level is consistant with there being no catastrophic new leaks in the lid. I'll vent this shortly so we can install the breadboard and the green fiber feedthrough Rich and I removed from HAM X today.