- posted 16:26, Sunday 28 July 2024 - last comment - 20:34, Monday 05 August 2024(11714)
Prestabilization Chamber Assembly Progress

I spliced together the interferometer for the GRAVITES laser frequency prestabilization chamber. I'm getting around 97% visibility in the Michelson after balancing powers with the VOAs. Should be sufficient based on the reference we're aiming for.  I also wired up the temperature sensors for both shields and the heater for the outer shield baseplate.  Just a few tasks left before we can close up and pump down:

  1. Clean and assemble in-air mounting structure for chamber.  Parts are supposed to arrive tomorrow morning.
  2. Re-clean the inner copper shield.  The solvent spotting on the shield will likely raise the emissivity.  I think we can do better.
  3. Move the 3'x3' breadboard onto the main table.  Prestabilization setup will go on this breadboard.
  4. Assemble the vacuum chamber and pump down.  We're aiming for a rough vacuum (1e-2 torr)
Images attached to this report
Comments related to this report
epolini - 20:34, Monday 05 August 2024 (11718)

To confirm the suspicion of a vacuum chamber leak, I verified that the pressure no longer decreases when the pump is activated but rises progressively over time.
At the beginning of last week we measured 1.9 torr while at the end of last week 2.95 torr and today 3.95 torr.