I have recovered the PLL after several months. There was no issue at all in the recovery process, meaning that it only took me ~30 minutes to close the PLL from scratch. The procedure is written here.
I first had to optimize the DC voltage on the PLL PD from the light power on the Diabolo side by changing the polarization paddles and the attenuator. I then blocked the Diabolo light using the attenuator and optimized the power on the Lightwave's side. To do this I had to slightly realign the input fiber coupler after the AOM setup.
Now the Ligtwave path has input 3mW to the PLL, and 0.5mW after the PBS, before the PLL PD. The Diabolo path is stable at 0.25mW after the PBS, before the PLL PD.
I had to search for the common laser temperature setpoint by tuning the lightwave's temperature to >35°C, while the temperature of the DIABOLO showed 34.81°C. The loop is then closed and the monitored error signal was centered on 0 with a 200-500mV thickness. The TF of the loop is attached and is very similar to the one taken months ago.
Note that the PLL should only be necessary for obtaining a beatnote between the two CLF beams of the two SQZ setups, or making the actual measurement. Alignment or mode matching to the MZI should not require the PLL.