LASTI General
wenxuan - posted 18:14, Wednesday 26 June 2024 (11687)
Planning of VOPO experiment

Eric, Wen

 

We sit down together today to talk about what to do/prepare for the VOPO squeezer at MIT. The goal is to build a spare squeezer for the LIGO observatories. Here are some of the quantities we'd like to measure.

 

1. NLG, threshold power. The L1 squeezer has a threshold power of 0.22 mW, corresponding to 34 mW of green light at SHG LAUNCH PD before the fiber (llo64250). We've only used up to 20 mW of green to fit the threshold. 

2. Escape efficiency at various co-resonance positions. We'd like to know how many useful spots on the crystals and how lossy they are, before sending them to the sites. 

3. Red and green finesse. 

4. Test cavity PZT

The items above require a 1064-nm laser, SHG, seed w/ PZT, OPO LSC, etc. 

 

5. SQZ McDonald's plots

This will require a LO w/ PZT and a homodyne.

 

6. Locked SQZ

This requires CLF and LO loops. 