Both Doors are off The VOPO table has been removed
The T240 pod is installed, plugged in, dogged down and JD has some location marks to generate a table location
The inner O-ring on the crane squeezer side is popping out, we currently have 6 six clips to keep it
The ISI is unlocked, and within 0.5mm of centered (with no fine tuning!!)
There are 6 free 25 pin cables (unlabeled and a bit of a rats nest)
There still is some aluminum foil, kimwipes, tools and a few loose screws on the table
------------
table is mostly balanced, 0.1,0,1.5Volts (i think), could enough might do more later
there are a lot of table weights stored in the beam tube, and some small side weights under the platform on the back door side
there are also a bunch of screws and dog clamps in the SS bin
I lost a screw on the cable clamp (1" 2-56??) there are still three so it will be fine
the T240 cable is on the lower feed through of it's flange