jacques - posted 11:41, Tuesday 21 May 2024 (11643)
Solution to the SHG lock problems: demod phase. Other optimizations and polarization controller DC supply issue

[Malo, Jacques] Date: yesteraday.

After a discussion with Eric, the most probable cause of the bad SHG PDH error signal is the demod phase which hasn't been adjusted since I added the polarization controller on the input fiber path. 

Sure enough, I adjusted the "phase=60" parameter in the iq_shg.setup(...) function in the setIq() function of the lockShg file (see code snipet below). Then the error signal scan made sense (see first screenshot) and the lock could be aquired with the correct amount of IR.

# Set IQ modulation/demodulation
def setIq():
    # Names to simplify later function calls
    asg_dither = r_shg.asg1
    iq_shg = r_shg.iq0
    # Add a constant voltage to the output so we never drive the PZT with a
    # negative voltage
    #asg_dither.waveform = 'dc'
    #asg_dither.offset = 0.21 #0.21
    #asg_dither.output_direct = 'out1'
    #asg_dither.trigger_source = 'immediately'
    # Start the IQ modulation/demodulation
    iq_shg.setup(frequency=50e6, bandwidth=[1e6], gain=0.0, 
             phase=60, acbandwidth=1E6, amplitude= 0.4, # 0.2 , #min((1-asg_dither.offset),asg_dither.offset), 
             input ='in2', output_direct="out1", 
             output_signal='quadrature', quadrature_factor=1)

However, even with an optimized demod angle and the SHG loop closed, I noticed that the measured GR on the OPO reflection's PDH PD DC (the PD set vertically on the FI to the OPO), was lower by 20-30% than the peak of GR on this same PD when the SHG was scanned. Tuning the SHG temperature while the loop was closed did not seem to improve this. Therefore we only produced 23mW of GR out of the OPO instead of the 30mW measured last week. It is not clear to me where this discrepancy comes from. The input IR to the SHG was 60mW, same as measured last week.

We then tried to lock the OPO by tuning its demod phase. The PDH error signal scan seems skewed (see second picture) but after discussion with Eric, he suggests that this is due to the scan being too slow, such that the OPO suffers some thermal transient while scanning. Thus the error signal should look more symmetric if we scanned faster. This is yet to be tested. Nevertheless, the OPO could be locked with the current code and demod phase of -45. See code snipet below, which is the lock(...) function on the lockOPO python file. Notice that the argument which corresponds to the demod phase is now called "demod_phase" and is now an internal variable of the lock(...) function, which means that changing it live is tedious without copy-pasting the script in a Jupyter notebook/Jupyterlab.

#%%
def lock(tolerance = 10, stepsPerRes = 20, dual = True):
    start_time = time.time()
    ################################
    #           INPUTS             #
    ################################
    # PDH modulation amplitude [Volts]
    modulation_amplitude = 0.2
    # PDH modulation frequency [Hz]
    modulation_freq = 50e6
    # PDH Demodulation Phase [Degrees]
    demod_phase = -45
    # Scope Decimation (sets scanning speed)
    scopeDecimation = 16384 # max is 16384
    ################################
    #         END INPUTS           #
    ################################
    stop()
    #shortcuts
    iq_opo = r_opo.iq0

    print("Take a scope measurement (Green)")
    pztG, pdhG = measureErrorSignal(demod_phase = demod_phase, 
                                    modulation_freq = modulation_freq, 
                                    modulation_amplitude = modulation_amplitude,
                                    make_plot = False)

    print("Take a scope measurement (IR)")
    pztIr, pdIr = measureIrResonance(make_plot = False)

[...]

At this point, the intensity fluctuations of the GR made any CLF amplification fluctuate by about 50% of its max amplitude (measured on the PD to the HD path). So instead of continuing with the loops, we decided to recover the good temperature/OPO crystal setpoint with maximized NLG. Scanning the OPO, and with the CLF still at 3MHz, we could achieve an amplification factor of ~14 (1.06V on the DC power of the "PD to HD", when CLF was amplified, vs 76mV when the temperature was way off its optimal setpoint). This should convert to a good NLG (I forgot to put the CLF at 0Hz detuning to make the actual measurement). This was obtained with ~20mW of GR and tec.shgSetpoint(33.15), which is quite lower than the ~34°C that was previously found.

Finally we tried to set up the polarization controller for intensity stabilization but we suffered from a DC supply issue, where the controller was drawing too much current and too little voltage than its intended setpoint (max 1.2A and +-12V), as soon as the DC supply was turned on. It is not clear how one should fix this.

 

Next steps:

  1. scan the OPO faster in the PDH locking sequence to make the automatic slope fit more robust,
  2. redo a measurement of the NLG with the CLF offset set at 0,
  3. solve the issue of the polarization controller,
  4. Do a TF and spectrum measurement of the SHG and OPO loops to see where the 150Hz noise comes from
  5. Debug the HD board
Images attached to this report