Reports until 12:03, Tuesday 14 May 2024
cSQZ General
hudsonl - posted 12:03, Tuesday 14 May 2024 (11631)
CSQZ SHG Silicon RFPD Replaced with InGaAs RFPD
I replaced the custom Silicon RFPD with a Thorlabs InGaAs RFPD. This looks to have significantly improved the SHG lock's SNR, especially at low powers. This solved a problem that with high power sent to the OPO and low power sent to the SHG, the SHG cavity would come unlocked due to any small disturbance on the table.

The Thorlabs PD is located off of the optics table and will eventually need to be moved back to the compact squeezer board for compactness. This is a relatively low priority until the Heisenberg interferometer experiment is completed.