Displaying report 1-1 of 1.
Reports until 19:11, Friday 19 April 2024
GRAVITES General
epolini - posted 19:11, Friday 19 April 2024 (11597)
Cable trays installed inside the cleanroom structure for GRAVITES

[Myron, Eleonora]

We installed two cable trays inside the clear room structure in green lab for the gravites experiment. The cable trays allows to bring the cables from the PDs on the bench and the instruments to the new rack we recently installed. We installed 2 trays 118'' long.

NB. On mcmaster it said 10 foot and 118'', we discovered that unfortunately they are 118'' and the 10 foot is just an appoximation. 

We connected them in a T shape. I attach some pictures here to show how we connected them with the cleanroom structure and between them.

Images attached to this report
Displaying report 1-1 of 1.