Reports until 19:29, Tuesday 02 April 2024
Heisenberg IFO General
jacques - posted 19:29, Tuesday 02 April 2024 - last comment - 19:38, Wednesday 03 April 2024(11582)
Temperature actuation on the PLL and problems with the IIR filter

I just tested a code to actuate on the temperature of the Diabolo to keep the PLL stable. It seems to work in the time I let it on (30mins, the correction signal stays around mid-range i.e. 0.5V). Next step is to monitor the loop on a longer time scale.

I tried adding the IIR filter to notch out the PZT resonance but it was throwing me the error that two poles cannot have the same value. It could be that the iir only requires one of the two complex conjugates to be sent to it. It should also be useful to test this module on standalone with a spectrum analyzer.

Somehow today's phase noise is lower than yesterday's by about 30%: we have 22mrad between 1kHz and 100kHz.

Non-image files attached to this report
Comments related to this report
jacques - 19:38, Wednesday 03 April 2024 (11584)

The problem was solved by deleting the config file of the correposnding RP. Somehow, when wrong values of the zeros/poles of the IIR are given, it retains them and it is impossible ot change them without deleting the config file...