Reports until 19:48, Wednesday 10 January 2024
cSQZ General
hudsonl - posted 19:48, Wednesday 10 January 2024 (11470)
Beam Alignment to SHG
After moving the compact squeezer and the electronics box, the SHG alignment had changed, although we still saw clear cavity flashes. It was easy to re-align the beam into the SHG by adjusting the tip/tilt of the fiber collimator and the PBS. Attached images show cavity transmission scans prior to and after alignment.
Images attached to this report