Reports until 09:46, Wednesday 18 October 2023
cSQZ General
hudsonl - posted 09:46, Wednesday 18 October 2023 (11370)
Moving CSQZ Electronics Rack
We're going to move the compact squeezer's electronics rack from the optics table to the floor to free up space. Here are some notes on the setup that should make re-assembly easier.

(1) Photodetectors should be powered with the white cable on the three-pronged connector up and the red cable on the two-pronged connector on the left. (See attached picture)

(2) PDH loop has 35dB (blue box) high-power RF amp between red pitaya's output and EOM. PDH loop RFPD has 23dB of amplification.

(3) CLF path is fiber box -> Polarization controller -> Fiber to free space coupler.
Images attached to this report