I rearranged the shelves next to the GRAVITES prototype in NW22 (see Fig. 1). The fibres are on the bottom shelf (it should be verified that they are all working properly). With Ben we moved the power supply to power the VCO from NW17 to the second level shelf here, on the left. On the third level shelf, I added a plastic box (see Fig. 2) where inside there are two light pens to check the fibres, the necessary to clean the fibres and the electronics components needed to implement the longitudinal control loop by acting on AOM (see entry #11264). The power supplies that were scattered on the bench were placed on the top shelf of the rack below the bench, as shown in the bottom right-hand corner of Fig. 1.