Displaying report 1-1 of 1.
Reports until 19:16, Wednesday 19 July 2023
GRAVITES General
epolini - posted 19:16, Wednesday 19 July 2023 - last comment - 17:44, Friday 18 August 2023(11264)
Electronic components moved from highbay to NW22

[Vicky, Eleonora, Eric]

We moved some electronics from the drawer in highbay to NW22 in order to be able to implement a feedback loop to control a long fiber length with an AOM. We took a free space AOM from the PSL table (see Fig. 1).

The electronic components are shown in Fig. 2.

 

Images attached to this report
Comments related to this report
epolini - 18:54, Friday 21 July 2023 (11269)

[Vicky, Eleonora]

In the attached picture, the fiber length control schematic including the electronic components as they are going to be implemented in the next days.

Images attached to this comment
epolini - 17:44, Friday 18 August 2023 (11294)
Displaying report 1-1 of 1.