Displaying report 1-1 of 1.
Reports until 14:23, Sunday 02 July 2023
GRAVITES General
epolini - posted 14:23, Sunday 02 July 2023 (11248)
73% coupling achieved

[Eleonora, Eric]

After a careful search for another collimator, we found a F220APC-1064 in the Highbay, which has a focal length of 11.17mm and collimates the beam at 2.4mm.

After installing it  (see picture attached) and aligning it with the help of the RIO fiber laser, it was easily reached 73% of coupling (6.33mW before the fiber port and 4.66mW after the 2-meters fiber).

This is good enough for our purpose.

 

Images attached to this report
Displaying report 1-1 of 1.