Chris, Eleonora, Lisa
Today we moved the CyMAC that was used in the LASTI filter cavity to NW22, to be used as data acquisition system for Nikhil's experiment (called testbedAI for now), and the fiber interferometer while it is in NW22. We moved (smoothly, very very smoothly) the whole cart with the CyMAC and its computer from NW17 to the control room of NW22 (to be moved near Nikhil/Eleonora's table).
This is a modified version of the CyMAC with added fast ADCs, old MIT ilog.
RCG was upgraded to 5.14 (probably by Chris and Eleonora) on May 12.